Forthcoming significant roadworks in the W4 area The following roadworks are likely to cause some delays in the Chiswick area Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer
A4 Hogarth Lane, Chiswick |
19 March — 27 March |
Delays likely Lane closure |
Works description: 1 x joint hole & 2m trench for 1 x new LV connection |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30002770 |
A4 Hogarth Lane, Chiswick |
28 March — 30 March |
Delays likely Lane closure |
Works description: HOUNSLOW CLEANING PROGRAMME First Night inner circle (offside lane) and offside lane closures, all junctions (first 50-100 metres) Second Night near side lane closures, all junctions (first 50-100 metres) |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430368661 |
A315,A205 Kew Bridge Road, Brentford |
26 March — 27 March |
Delays likely Lane closure |
Works description: SAHARA SURVEYING LEAK DETECTION, NO EXCAVATION, CHAMBER OPENING ONLY. |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU600KGR087-10 |
|
A315 Chiswick High Road, Chiswick |
27 March — 29 March |
Delays likely Traffic control (give & take) |
Works description: Clear Carriageway Blockage |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSEMFI/100276906 |
|
A402 Goldhawk Road, Hammersmith |
25 March — 05 April |
Delays likely Lane closure |
Works description: WORKING ON BEHALF OF THAMES WATER TO ACCESS MAN HOLE TO CARRY OUT SEWER DIVERSION |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU821C952/RSCRCCTV/G003 |
|
B490 Acton Lane, Chiswick |
26 March — 28 March |
Delays likely Traffic control (multi-way signals) |
Works description: Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141GZVP--000001 |
|
Great West Road, Hammersmith |
26 March — 27 March |
Delays likely Lane closure |
Works description: Maintenance + carriageway resurfacing repair |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430367829 |
|
M4 |
25 March — 26 March |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound exit slip road closure for pier monitoring works. Diversion via Highways England Network. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 76259 |
|
M4 |
26 March — 27 March |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound exit slip road closure for pier monitoring works. Diversion via Highways England Network. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 76259 |
|
|
B4491 Popes Lane, Ealing |
18 March — 24 May |
Delays likely Traffic control (multi-way signals) |
Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP705S30001052 |
|
A406 Gunnersbury Avenue (north Circular Road) |
15 March — 28 March |
Delays likely Lane closure |
Works description: Works to reinstate the eastern footway of the A406 Gunnersbury Avenue over the Power Road Bridge. Works will require a Lane 1 SB for a safety zone. Works coordinated with the Gunnersbury Safety Scheme Phase 1. TM 24/7 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG400401676 |
|
A406 Gunnersbury Avenue (north Circular Road) |
15 March — 29 March |
Delays likely Lane closure |
Works description: Works to reinstate the eastern footway of the A406 Gunnersbury Avenue over the Power Road Bridge. Works will require a Lane 1 SB for a safety zone. Works coordinated with the Gunnersbury Safety Scheme Phase 2. TM 24/7 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG400402049 |
|
A406 Gunnersbury Avenue (North Circular Road) |
21 January — 19 March |
Delays likely Contra-flow |
Works description: Phase 1a - 1f Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG432343386 |
A4020 Uxbridge Road, Hammersmith and Fulham |
18 February — 01 April |
Delays likely Traffic control (two-way signals) |
Works description: MAJOR LARGE DIAMETER MAINS ABANDONMENT ABANDON 501M OF 24" GAS MAIN |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000802012 |
A315 King Street, Hammersmith |
07 January — 22 June |
Delays likely Traffic control (multi-way signals) |
Works description: IMGA191090. MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE PLACE.ABANDON 722M OF METALLIC MAIN AND REPLACE IT WITH PE MAIN.INSERTION METHOD TO BE USED, NEW MAIN TO BE SLEEVED INSIDE THE OLD TOREDUCE EXCAVATION. STORAGE CONTAINER & WELFARE UNIT TO BE USED ON SITE. |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000752541 |
|
Source: www.roadworks.org
March 26, 2019
|