A316 Burlington Lane, Chiswick |
20 March — 21 March |
Delays likely Lane closure |
Works description: BARRIER REPAIR |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430367394 |
|
A406 Gunnersbury Avenue, Ealing |
19 March — 20 March |
Delays likely Traffic control (two-way signals) |
Works description: CARRIAGEWAY PATCHING REPAIRS |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430366492 |
|
A4 Hogarth Lane, Chiswick |
19 March — 27 March |
Delays likely Lane closure |
Works description: 1 x joint hole & 2m trench for 1 x new LV connection |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30002770 |
|
Avenue Road, Acton |
18 March — 22 March |
Delays likely Road closure |
Works description: new customer water supplu 1x63mm unmtd BP Bulk P1-38+L/L(Conn), works inthe footway and in Carriageway. |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU30700080604579-001001 |
|
B350 Lonsdale Road, Barnes |
19 March — 20 March |
Delays likely Traffic control (two-way signals) |
Works description: Replace 1 existing pole |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI002AP500264434100 |
|
B4491, A4000 Gunnersbury Lane, Acton |
20 March — 20 March |
Delays likely Traffic control (two-way signals) |
Works description: Install Thames Water pressure monitoring point |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU277PEALNG58/01 |
|
B4491 Popes Lane, Ealing |
18 March — 24 May |
Delays likely Traffic control (multi-way signals) |
Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP705S30001052 |
|
B490 Acton Lane, Acton |
18 March — 21 March |
Delays likely Traffic control (multi-way signals) |
Works description: JOINT HOLE AND TRENCH TO BOUNDARY FOR NEW SUPPLY |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30002708 |
|
B490 Acton Lane, Acton |
18 March — 24 March |
Delays likely Traffic control (multi-way signals) |
Works description: This permit is for Thames Water to carry out 2x25mm MDPE mtrd Supply Existing Domestic - Conversion from 1 House into 3 flats |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU307000808402520045-001 |
|
Dukes Avenue, Chiswick |
18 March — 22 March |
Delays likely Road closure |
Works description: Remedial works following sewer repairs |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU060002140THWZ--000002 |
|
M4 |
18 March — 19 March |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound exit slip road closure for pier monitoring works. Diversion via Highways England Network. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 76259 |
|
M4 |
19 March — 20 March |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound exit slip road closure for pier monitoring works. Diversion via Highways England Network. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 76259 |
M4 |
20 March — 21 March |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound exit slip road closure for pier monitoring works. Diversion via Highways England Network. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 76259 |
|
Sutton Court Road, Chiswick |
20 March — 22 March |
Delays likely Traffic control (multi-way signals) |
Works description: Valve Locate Cway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031153151-001 |
|