Traffic Delays Likely in Chiswick

Forthcoming significant roadworks in the W4 area

 
Participate

Bookmark and Share

Traffic and Travel in Chiswick

Sign up for our weekly Chiswick newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Chiswick area

Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer

chiswick roadworks

A4020 Uxbridge Road, Hammersmith and Fulham

18 February — 01 April

Delays likely Traffic control (two-way signals)

Works description: MAJOR LARGE DIAMETER MAINS ABANDONMENT ABANDON 501M OF 24" GAS MAIN

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000802012

Bollo Lane, Acton

16 February — 24 February

Delays likely Road closure

Works description: IMGC180336 - lay 18m x 125mm PE LP into site from 180mm Main in farsidecarriageway. service to feed steel riser around property terminating internally in meter room at rear

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000773660

Stamford Brook Avenue, Chiswick

18 February — 10 March

Delays likely Road closure

Works description: TRIAL HOLES TO PROVE EXISTING LOCATION OF WATER MAIN

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU821H676G/PBAT54/I001

M4

18 February — 19 February

Delays likely Road closure

Works location: Jct 2 Westbound Entry slip road.

Works description: M4 Jct 2 Entry slip road closure westbound for joint replacement survey works. Diversion via Local Authority roads.

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 78533

M4

18 February — 19 February

Delays likely Road closure

Works location: Jct 2 eastbound entry slip road.

Works description: M4 Jct 2 Entry slip road closure eastbound for joint replacement survey works. Diversion via Local Authority roads.

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 96054

M4

19 February — 20 February

Delays likely Road closure

Works location: Jct 2 eastbound entry slip road.

Works description: M4 Jct 2 Entry slip road closure eastbound for joint replacement survey works. Diversion via Local Authority roads.

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 96054

M4

19 February — 20 February

Delays likely Road closure

Works location: Jct 2 Westbound Entry slip road.

Works description: M4 Jct 2 Entry slip road closure westbound for joint replacement survey works. Diversion via Local Authority roads.

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 78533

A402 Goldhawk Road, Hammersmith and Fulham

20 February — 20 February

Delays likely Lane closure

Works description: SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY.

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU600CHB3003-4

M4

20 February — 21 February

Delays likely Road closure

Works location: Jct 2 Westbound Entry slip road.

Works description: M4 Jct 2 Entry slip road closure westbound for joint replacement survey works. Diversion via Local Authority roads.

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 78533

M4

20 February — 21 February

Delays likely Road closure

Works location: Jct 2 eastbound entry slip road.

Works description: M4 Jct 2 Entry slip road closure eastbound for joint replacement survey works. Diversion via Local Authority roads.

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 96054

A406 Gunnersbury Avenue (North Circular Road)

21 January — 19 March

Delays likely Contra-flow

Works description: Phase 1a - 1f Utility works, drainage and re-profiling works.

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG432343386

A315 King Street, Hammersmith

07 January — 22 June

Delays likely Traffic control (multi-way signals)

Works description: IMGA191090. MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE PLACE.ABANDON 722M OF METALLIC MAIN AND REPLACE IT WITH PE MAIN.INSERTION METHOD TO BE USED, NEW MAIN TO BE SLEEVED INSIDE THE OLD TOREDUCE EXCAVATION. STORAGE CONTAINER & WELFARE UNIT TO BE USED ON SITE.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000752541

A406 Gunnersbury Avenue (north Circular Road)

07 January — 05 March

Delays likely Lane closure

Works description: Phase 1a - 2c Utility works, drainage and re-profiling works.

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432343386

A406 Gunnersbury Avenue (North Circular Road)

24 November — 22 February

Delays likely Lane closure

Works description: Phase 1a - 4 Utility works, drainage and re-profiling works.

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432334046

Source: www.roadworks.org

February 19, 2019

Bookmark and Share