Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area
Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer
A4020 Uxbridge Road, Hammersmith and Fulham |
18 February — 01 April |
Delays likely Traffic control (two-way signals) |
Works description: MAJOR LARGE DIAMETER MAINS ABANDONMENT ABANDON 501M OF 24" GAS MAIN |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000802012 |
|
Bollo Lane, Acton |
16 February — 24 February |
Delays likely Road closure |
Works description: IMGC180336 - lay 18m x 125mm PE LP into site from 180mm Main in farsidecarriageway. service to feed steel riser around property terminating internally in meter room at rear |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000773660 |
|
Stamford Brook Avenue, Chiswick |
18 February — 10 March |
Delays likely Road closure |
Works description: TRIAL HOLES TO PROVE EXISTING LOCATION OF WATER MAIN |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU821H676G/PBAT54/I001 |
|
M4 |
18 February — 19 February |
Delays likely Road closure |
Works location: Jct 2 Westbound Entry slip road. |
Works description: M4 Jct 2 Entry slip road closure westbound for joint replacement survey works. Diversion via Local Authority roads. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 78533 |
|
M4 |
18 February — 19 February |
Delays likely Road closure |
Works location: Jct 2 eastbound entry slip road. |
Works description: M4 Jct 2 Entry slip road closure eastbound for joint replacement survey works. Diversion via Local Authority roads. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 96054 |
|
M4 |
19 February — 20 February |
Delays likely Road closure |
Works location: Jct 2 eastbound entry slip road. |
Works description: M4 Jct 2 Entry slip road closure eastbound for joint replacement survey works. Diversion via Local Authority roads. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 96054 |
|
M4 |
19 February — 20 February |
Delays likely Road closure |
Works location: Jct 2 Westbound Entry slip road. |
Works description: M4 Jct 2 Entry slip road closure westbound for joint replacement survey works. Diversion via Local Authority roads. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 78533 |
|
A402 Goldhawk Road, Hammersmith and Fulham |
20 February — 20 February |
Delays likely Lane closure |
Works description: SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY. |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU600CHB3003-4 |
|
M4 |
20 February — 21 February |
Delays likely Road closure |
Works location: Jct 2 Westbound Entry slip road. |
Works description: M4 Jct 2 Entry slip road closure westbound for joint replacement survey works. Diversion via Local Authority roads. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 78533 |
|
M4 |
20 February — 21 February |
Delays likely Road closure |
Works location: Jct 2 eastbound entry slip road. |
Works description: M4 Jct 2 Entry slip road closure eastbound for joint replacement survey works. Diversion via Local Authority roads. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 96054 |
|
A406 Gunnersbury Avenue (North Circular Road) |
21 January — 19 March |
Delays likely Contra-flow |
Works description: Phase 1a - 1f Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG432343386 |
A315 King Street, Hammersmith |
07 January — 22 June |
Delays likely Traffic control (multi-way signals) |
Works description: IMGA191090. MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE PLACE.ABANDON 722M OF METALLIC MAIN AND REPLACE IT WITH PE MAIN.INSERTION METHOD TO BE USED, NEW MAIN TO BE SLEEVED INSIDE THE OLD TOREDUCE EXCAVATION. STORAGE CONTAINER & WELFARE UNIT TO BE USED ON SITE. |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000752541 |
|
A406 Gunnersbury Avenue (north Circular Road) |
07 January — 05 March |
Delays likely Lane closure |
Works description: Phase 1a - 2c Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432343386 |
|
A406 Gunnersbury Avenue (North Circular Road) |
24 November — 22 February |
Delays likely Lane closure |
Works description: Phase 1a - 4 Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432334046 |
Source: www.roadworks.org
February 19, 2019
|