Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area
Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer
Grove Park Terrace, Chiswick |
12 February — 12 February |
Delays likely Road closure |
Works location: Level crossing |
Works description: Dig wet bed |
Responsibility for works: Network Rail |
Current status: Advanced planning |
Works reference: KL156HOU-08-75-120219 |
A4020 Uxbridge Road, Hammersmith and Fulham |
13 February — 14 February |
Delays likely Traffic control (multi-way signals) |
Works description: Access existing BT Network to provide new fibre cable for new customer connection |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005CC8W0000000WAKH588P |
A406 Gunnersbury Avenue |
21 January — 15 February |
Delays likely Traffic control (two-way signals) |
Works description: IMGA192368 MAINS CONNECTIONS FOR ASSOCIATED WORKS IN KINGSBRIDGE AVENUE |
Responsibility for works: Cadent |
Current status: Advanced planning |
Works reference: AZ0071000763594 |
A406 Gunnersbury Avenue (North Circular Road) |
21 January — 19 March |
Delays likely Contra-flow |
Works description: Phase 1a - 1f Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG432343386 |
A315 King Street, Hammersmith |
07 January — 22 June |
Delays likely Traffic control (multi-way signals) |
Works description: IMGA191090. MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE PLACE.ABANDON 722M OF METALLIC MAIN AND REPLACE IT WITH PE MAIN.INSERTION METHOD TO BE USED, NEW MAIN TO BE SLEEVED INSIDE THE OLD TOREDUCE EXCAVATION. STORAGE CONTAINER & WELFARE UNIT TO BE USED ON SITE. |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000752541 |
|
A406 Gunnersbury Avenue (north Circular Road) |
07 January — 05 March |
Delays likely Lane closure |
Works description: Phase 1a - 2c Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432343386 |
|
A4 Great West Road, Brentford |
07 January — 16 February |
Delays likely Lane closure |
Works description: A4 Pier monitoring - removal of delaminating concrete. Lane 3 and 2 closure east and westbound. Diversion from M4 Jct 2 to Jct 3, A312 southbound and A4 eastbound.. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: FN59343449 |
|
B4491,A4000 Gunnersbury Lane, Acton |
14 December — 13 February |
Delays likely Traffic control (Stop/Go boards) |
Works description: Temporary Structure Licence - Crane |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV008TS0387 |
A406 Gunnersbury Avenue (North Circular Road) |
24 November — 22 February |
Delays likely Lane closure |
Works description: Phase 1a - 4 Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432334046 |
Source: www.roadworks.org
February 12, 2019
|