Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area
Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer
A315 Chiswick High Road, Chiswick |
17 January — 17 January |
Delays likely Traffic control (multi-way signals) |
Works description: S81 EMERGENCY COVER REPLACEMEN--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141FYLY--000001 |
|
M4 |
15 January — 16 January |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound Exit Slip. Slip Closure for pier monitoring works. Diversion via HE Network. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 76257 |
|
M4 |
16 January — 17 January |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound Exit Slip. Slip Closure for pier monitoring works. Diversion via HE Network. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 76257 |
|
Great West Road, Hammersmith |
14 January — 15 January |
Delays likely Lane closure |
Works location: Unknown |
Works description: Footway Patching repairs |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430349708 |
A315 King Street, Hammersmith |
07 January — 22 June |
Delays likely Traffic control (multi-way signals) |
Works description: IMGA191090. MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE PLACE.ABANDON 722M OF METALLIC MAIN AND REPLACE IT WITH PE MAIN.INSERTION METHOD TO BE USED, NEW MAIN TO BE SLEEVED INSIDE THE OLD TOREDUCE EXCAVATION. STORAGE CONTAINER & WELFARE UNIT TO BE USED ON SITE. |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000752541 |
|
A406 Gunnersbury Avenue (north Circular Road) |
07 January — 05 March |
Delays likely Lane closure |
Works description: Phase 1a - 2c Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432343386 |
|
A4 Great West Road, Brentford |
07 January — 16 February |
Delays likely Lane closure |
Works description: A4 Pier monitoring - removal of delaminating concrete. Lane 3 and 2 closure east and westbound. Diversion from M4 Jct 2 to Jct 3, A312 southbound and A4 eastbound.. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: FN59343449 |
|
B4491,A4000 Gunnersbury Lane, Acton |
14 December — 13 February |
Delays likely Traffic control (Stop/Go boards) |
Works description: Temporary Structure Licence - Crane |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV008TS0387 |
A406 Gunnersbury Avenue (North Circular Road) |
24 November — 22 February |
Delays likely Lane closure |
Works description: Phase 1a - 4 Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432334046 |
Source: www.roadworks.org
January 15, 2019
|