Traffic Delays Likely in Chiswick

Forthcoming significant roadworks in the W4 area

 
Participate

Bookmark and Share

Traffic and Travel in Chiswick

Sign up for our weekly Chiswick newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Chiswick area

chiswick roadworks

Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018

A315 Chiswick High Road, Chiswick

17 September — 18 September

Delays likely Contra-flow

Works description: 25/005 TEL00195806 - RECUT OF MAGNETOMETER SD5, 20:00 - 23:59, W/B LANE 1 CLOSED, W/B TRAFFIC TO USE E/B LANE 2

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004136

A406 Gunnersbury Avenue (north Circular Road)

17 September — 22 September

Delays likely Road closure

Works description: C/way resurfacing and lining. Full northbound road closure& Lane 2 closure southbound.

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432311029

A406 Gunnersbury Avenue (north Circular Road)

17 September — 22 September

Delays likely Road closure

Works description: C/way resurfacing and lining. Full northbound road closure& Lane 2 closure southbound.

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432307924

A4 Great West Road, Brentford

16 September — 18 September

Delays likely Lane closure

Works description: Bridge repairs

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG430325164

B490 Acton Lane, Chiswick

17 September — 29 September

Delays likely Lane closure

Works description: Repair Thames Water Leak on High Pressure Main

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU277PTML197696/01

M4

17 September — 18 September

Delays likely Road closure

Works location: Slip Closure Eastbound.

Works description: M4 Jct 2 Eastbound Entry Slip Slip Closure Eastbound for resurfacing works Diversion via Local Authority Network

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 62983

A205 Chiswick High Road (north Circular Road), Chiswick

19 September — 21 September

Delays likely Road closure

Works description: C/way patching TMAN:N1801769-001-W001

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG430307682

A4,A205 Surrey Crescent, Chiswick

19 September — 21 September

Delays likely Road closure

Works description: C/way patching TMAN:N1801769-001-W001

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG430307699

A4 Great West Road, Brentford

19 September — 21 September

Delays likely Road closure

Works description: C/way patching TMAN:N1801769-001-W001

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG430310498

M4

19 September — 20 September

Delays likely Road closure

Works location: Slip Closure Eastbound.

Works description: M4 Jct 2 Eastbound Entry Slip Slip Closure Eastbound for resurfacing works Diversion via Local Authority Network

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 62983

A406 Gunnersbury Avenue

18 September — 20 September

Delays likely Traffic control (two-way signals)

Works description: CARRIAGEWAY REPAIR

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG430324582

A406 Gunnersbury Avenue (north Circular Road)

17 September — 22 September

Delays likely Road closure

Works description: C/way resurfacing and lining. Full northbound road closure& Lane 2 closure southbound.

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432311029

A406 Gunnersbury Avenue (north Circular Road)

17 September — 22 September

Delays likely Road closure

Works description: C/way resurfacing and lining. Full northbound road closure& Lane 2 closure southbound.

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432307924

M4

18 September — 19 September

Delays likely Road closure

Works location: Slip Closure Eastbound.

Works description: M4 Jct 2 Eastbound Entry Slip Slip Closure Eastbound for resurfacing works Diversion via Local Authority Network

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 62983

A315 King Street, Hammersmith

14 September — 02 October

Delays likely Road closure

Works description: TEST

Responsibility for works: Hammersmith and Fulham

Current status: Advanced planning

Works reference: FE900308943

A4 Great West Road, Brentford

15 September — 18 September

Delays likely Lane closure

Works description: Bridge Works

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG430325163

A4 Great West Road, Brentford

16 September — 18 September

Delays likely Lane closure

Works description: Bridge repairs

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG430325164

Fishers Lane, Chiswick

01 September — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing,

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000563

B408 Paddenswick Road, Hammersmith

20 August — 01 October

Delays likely Traffic control (multi-way signals)

Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE FOOTWAY & CARRIAGEWAY

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU895MGJV/FLIPS/193360A

A406 Gunnersbury Avenue (North Circular Road)

04 August — 22 September

Delays likely Lane closure

Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432311016

A406 Gunnersbury Avenue (North Circular Road)

04 August — 22 September

Delays likely Lane closure

Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432307843

B491 Southfield Road, Chiswick

01 August — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing,

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000541

Hardwicke Road, Chiswick

18 June — 31 October

Delays likely Road closure

Works description: Microsurfacing

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000529

Gunnersbury Avenue (North Circular Road)

7 Jun 2017 - 16 Nov 2018

Delays likely Lane Closure

Works description:1 northbound lane closed, one running lane maintained northbound and two southbound. Traffic lanes will be realigned on the carriageway to suit phases of work during demolition of the main bridge. Lanes will first be slewed to the east and then to the west.

Responsibility for works: Transport For London

Current status: Work in progress

Source: www.roadworks.org

September 18, 2018

Bookmark and Share