Traffic Delays Likely in Chiswick

Forthcoming significant roadworks in the W4 area

 
Participate

Bookmark and Share

Traffic and Travel in Chiswick

Sign up for our weekly Chiswick newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Chiswick area

chiswick roadworks

Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018

Devonshire Road, Chiswick

01 September — 04 September

Delays likely Road closure

Works description: Permenent reinstatement of road crossing

Responsibility for works: Scottish and Southern Power Distribution

Current status: Planned work about to start

Works reference: LP551S30001230

Fishers Lane, Chiswick

01 September — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing,

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000563

M4

03 September — 04 September

Delays likely Road closure

Works location: Slip Closure Eastbound.

Works description: M4 Jct 2 Eastbound Entry Slip Slip Closure Eastbound for resurfacing works Diversion via Local Authority Network

Responsibility for works: Highways England

Current status: Planned work about to start

Works reference: 62983

Spring Grove, Chiswick

03 September — 08 September

Delays likely Road closure

Works location: Unknown

Works description: new customer water supply 1x25mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU307000806822390045-001

A315 Chiswick High Road, Chiswick

31 August — 05 September

Delays likely Traffic control (multi-way signals)

Works description: SEW BLCK TRAFFIC SENSITIVE ST

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002139RYBY--000010

A315 Chiswick High Road, Chiswick

31 August — 05 September

Delays likely Traffic control (give & take)

Works description: LAY 4M DUCT IN C/W AND 4M IN F/W

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK100/SSEMBU/100240402

A315 Chiswick High Road, Chiswick

31 August — 05 September

Delays likely Traffic control (multi-way signals)

Works description: SEWER CLEANING - PLANNED

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002141CRBP--000002

A315 Chiswick High Road, Chiswick

30 August — 04 September

Delays likely Traffic control (multi-way signals)

Works description: SEWER CLEANING - PLANNED

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002139RYBY--000009

A3000 Heathfield Terrace, Chiswick

28 August — 10 September

Delays likely Traffic control (give & take)

Works description: Excavation works to install duct and build associated chambers for fibre optic cable installation.

Responsibility for works: GLOBAL CROSSING (UK) TELECOMMUNICATIONS

Current status: Planned work about to start

Works reference: RT003CHISWICK-003294

B490 Acton Lane, Chiswick

28 August — 11 September

Delays likely Lane closure

Works description: Repair Thames Water Leak on High Pressure Main

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU277PTML197696/01

B408 Paddenswick Road, Hammersmith

20 August — 01 October

Delays likely Traffic control (multi-way signals)

Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE FOOTWAY & CARRIAGEWAY

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU895MGJV/FLIPS/193360A

A406 Gunnersbury Avenue (North Circular Road)

04 August — 22 September

Delays likely Lane closure

Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432311016

A406 Gunnersbury Avenue (North Circular Road)

04 August — 22 September

Delays likely Lane closure

Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432307843

B491 Southfield Road, Chiswick

01 August — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing,

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000541

Hardwicke Road, Chiswick

18 June — 31 October

Delays likely Road closure

Works description: Microsurfacing

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000529

Gunnersbury Avenue (North Circular Road)

7 Jun 2017 - 16 Nov 2018

Delays likely Lane Closure

Works description:1 northbound lane closed, one running lane maintained northbound and two southbound. Traffic lanes will be realigned on the carriageway to suit phases of work during demolition of the main bridge. Lanes will first be slewed to the east and then to the west.

Responsibility for works: Transport For London

Current status: Work in progress

Source: www.roadworks.org

September 4, 2018

Bookmark and Share