Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area
Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018
Devonshire Road, Chiswick |
01 September — 04 September |
Delays likely Road closure |
Works description: Permenent reinstatement of road crossing |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30001230 |
|
Fishers Lane, Chiswick |
01 September — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000563 |
|
M4 |
03 September — 04 September |
Delays likely Road closure |
Works location: Slip Closure Eastbound. |
Works description: M4 Jct 2 Eastbound Entry Slip Slip Closure Eastbound for resurfacing works Diversion via Local Authority Network |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 62983 |
|
Spring Grove, Chiswick |
03 September — 08 September |
Delays likely Road closure |
Works location: Unknown |
Works description: new customer water supply 1x25mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU307000806822390045-001 |
|
A315 Chiswick High Road, Chiswick |
31 August — 05 September |
Delays likely Traffic control (multi-way signals) |
Works description: SEW BLCK TRAFFIC SENSITIVE ST |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002139RYBY--000010 |
|
A315 Chiswick High Road, Chiswick |
31 August — 05 September |
Delays likely Traffic control (give & take) |
Works description: LAY 4M DUCT IN C/W AND 4M IN F/W |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSEMBU/100240402 |
|
A315 Chiswick High Road, Chiswick |
31 August — 05 September |
Delays likely Traffic control (multi-way signals) |
Works description: SEWER CLEANING - PLANNED |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141CRBP--000002 |
|
A315 Chiswick High Road, Chiswick |
30 August — 04 September |
Delays likely Traffic control (multi-way signals) |
Works description: SEWER CLEANING - PLANNED |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002139RYBY--000009 |
|
A3000 Heathfield Terrace, Chiswick |
28 August — 10 September |
Delays likely Traffic control (give & take) |
Works description: Excavation works to install duct and build associated chambers for fibre optic cable installation. |
Responsibility for works: GLOBAL CROSSING (UK) TELECOMMUNICATIONS |
Current status: Planned work about to start |
Works reference: RT003CHISWICK-003294 |
|
B490 Acton Lane, Chiswick |
28 August — 11 September |
Delays likely Lane closure |
Works description: Repair Thames Water Leak on High Pressure Main |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU277PTML197696/01 |
|
B408 Paddenswick Road, Hammersmith |
20 August — 01 October |
Delays likely Traffic control (multi-way signals) |
Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE FOOTWAY & CARRIAGEWAY |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU895MGJV/FLIPS/193360A |
|
A406 Gunnersbury Avenue (North Circular Road) |
04 August — 22 September |
Delays likely Lane closure |
Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432311016 |
|
A406 Gunnersbury Avenue (North Circular Road) |
04 August — 22 September |
Delays likely Lane closure |
Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432307843 |
|
B491 Southfield Road, Chiswick |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000541 |
|
Hardwicke Road, Chiswick |
18 June — 31 October |
Delays likely Road closure |
Works description: Microsurfacing |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000529 |
|
Gunnersbury Avenue (North Circular Road) |
7 Jun 2017 - 16 Nov 2018 |
Delays likely Lane Closure |
Works description:1 northbound lane closed, one running lane maintained northbound and two southbound. Traffic lanes will be realigned on the carriageway to suit phases of work during demolition of the main bridge. Lanes will first be slewed to the east and then to the west. |
Responsibility for works: Transport For London |
Current status: Work in progress |
Source: www.roadworks.org
September 4, 2018
|