Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area
Hammersmith Bridge to Close for Four Days in August
Cars diverted and bus routes shortened for repairs ahead of major refurbishment - 20 August - 23 August
Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018
A402 Goldhawk Road, Hammersmith |
09 August — 16 August |
Delays likely Traffic control (multi-way signals) |
Works description: DSLAM STREET CABINET & POWER INSTALLATION. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006KNLEPSESHPHRDSB37-1 |
|
B409 Bath Road, Chiswick |
13 August — 16 August |
Delays likely Traffic control (multi-way signals) |
Works description: Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141DCQB--000001 |
|
B4491, A4000 Gunnersbury Lane, Acton |
13 August — 15 August |
Delays likely Traffic control (two-way signals) |
Works description: Non Excavation - 2 way lights to allow for cherry picker to sit in and access telecoms mast to carry out repair works. footpath closure and pedwalk supplied. The cherry Picker will only be for one day which will be 13/08/2018 |
Responsibility for works: Vodafone |
Current status: Planned work about to start |
Works reference: NX04188489/POLE/RTS/LB |
|
B4491, A4000 Gunnersbury Lane, Acton |
14 August — 16 August |
Delays likely Traffic control (multi-way signals) |
Works description: Aplant have advised me that they have copied the main lights head for head and there should be no issues with the pedestrian crossing |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005OP1W0000000IBUL4VVM |
|
M4 |
14 August — 15 August |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound Entry Slip Slip Closure for resurfacing works Diversion via Local Authority Network |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 62998 |
|
B408 Askew Road |
16 August — 19 August |
Delays likely Traffic control (two-way signals) |
Works location: Unknown |
Works description: Lay duct and install tee for customer connection. |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJFI/97394/LSME |
|
M4 |
15 August — 16 August |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound Entry Slip road Closure for resurfacing works. Diversion via Local Authority Network |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 62998 |
|
M4 |
16 August — 17 August |
Delays likely Road closure |
Works location: Slip Closure Westbound. |
Works description: M4 Jct 2 Westbound Entry Slip road Closure for resurfacing works. Diversion via Local Authority Network |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 62998 |
|
A406 Gunnersbury Avenue (North Circular Road) |
04 August — 22 September |
Delays likely Lane closure |
Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432311016 |
|
A406 Gunnersbury Avenue (North Circular Road) |
04 August — 22 September |
Delays likely Lane closure |
Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432307843 |
|
B491 Southfield Road, Chiswick |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000541 |
|
Hardwicke Road, Chiswick |
18 June — 31 October |
Delays likely Road closure |
Works description: Microsurfacing |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000529 |
|
Gunnersbury Avenue (North Circular Road) |
7 Jun 2017 - 16 Nov 2018 |
Delays likely Lane Closure |
Works description:1 northbound lane closed, one running lane maintained northbound and two southbound. Traffic lanes will be realigned on the carriageway to suit phases of work during demolition of the main bridge. Lanes will first be slewed to the east and then to the west. |
Responsibility for works: Transport For London |
Current status: Work in progress |
Source: www.roadworks.org
August 15, 2018
|