Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area.
A205 Chiswick High Road (North Circular Road), Chiswick |
14 July — 28 July |
Delays likely Traffic control (two-way signals) |
Works location: A205 |
Works description: Approx 102m Excavation Dual Hv Circuit - Hv Supply To New Brentford Stadium Development. Ttro Application Also Required For Road Closure On Lionel Road South, Lane Closure At Jnc With South Circular Road And Capital Interchange Way. |
Responsibility for works: Gas Transportation Co Ltd |
Current status: Advanced planning |
A406 Gunnersbury Avenue (North Circular Road) |
16 July — 17 July |
Delays likely Contra-flow |
Works location: A406 |
Works description: Closure Of One Lane In Both Directions, Maintaining Traffic Flow With A Contraflow System To Facilitate Lifting Of Service Bridge. The Contraflow Will Be On The Eastern Side Of The Main Bridge. |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
A406 Gunnersbury Avenue (North Circular Road) |
11 July — 21 August |
Delays likely Lane closure |
Works location: A406 |
Works description: Closure Of One Northbound Lane To Facilitate The Diversion Of Thames Water Main Onto Service Bridge. Northbound Traffic Flow Maintained In Lane Two |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
A205 Chiswick High Road (North Circular Road), Chiswick |
14 July — 28 July |
Delays likely Traffic control (two-way signals) |
Works location: A205 |
Works description: Approx 102m Excavation Dual Hv Circuit - Hv Supply To New Brentford Stadium Development. Ttro Application Also Required For Road Closure On Lionel Road South, Lane Closure At Jnc With South Circular Road And Capital Interchange Way. |
Responsibility for works: Gas Transportation Co Ltd |
Current status: Advanced planning |
Devonshire Road, Chiswick |
04 July — 09 August |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
Essex Place Square, Chiswick |
27 June — 15 July |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: National Grid Gas Plc |
Current status: Advanced planning |
|
A315/A205 Kew Bridge Road, Brentford |
06 July — 09 July |
Delays likely Lane closure |
Works location: A315/A205 |
Works description: ***Section 50*** Continued Installation Of Gas Main |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
A4 Great West Road, Brentford |
06 July — 16 July |
Delays likely Lane closure |
Works location: A4 |
Works description: 22:30 To 05:00hrs. Lane 1 And 2 Closure Or A Lane 3 And 2 Closure Eastbound For Delaminated Concrete Surveys Of The A4 Piers (Pier 31 To Pier 1) |
Responsibility for works: Highways England |
Current status: Planned work about to start |
|
Source: www.roadworks.org