Traffic Delays Likely in Chiswick

Forthcoming significant roadworks in the W4 area

 
Participate

Bookmark and Share

Traffic and Travel in Chiswick

Sign up for our weekly Chiswick newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Chiswick area.

A315 Chiswick High Road

30 June — 01 July

Delays likely Traffic control (multi-way signals)

Works location: A315

Works description: 25/005 - 104825 - Access Tfl Traffic Signal. Phase H Secondary Aspects On Pole 16 To Be Relocated To Pole 17. 22:00-05:00, Work Will Take Approx 2 Hours To Complete. W/B Lane 2 Closure. Site To Be Under Control Of Multi-Way Lights.

Responsibility for works: Transport For London

Current status: Planned work about to start

A406 Gunnersbury Avenue (North Circular Road)

01 July — 01 July

Delays likely Lane closure

Works location: A406

Works description: Closure Of One Northbound Lane To Install Pile Cap For Borred Pile Prior To The Service Bridge Lift

Responsibility for works: Transport For London

Current status: Planned work about to start

A205/A4 Surrey Crescent, Chiswick

02 July — 03 July

Delays likely Lane closure

Works location: A205/A4

Works description: Removal Of Trees From Footpath And Resurfacing Sb Lane. Sb Lane 1&2 Closure. Nb Lane 1 Closure.

Responsibility for works: Transport For London

Current status: Planned work about to start

A205 Chiswick High Road (North Circular Road), Chiswick

02 July — 03 July

Delays likely Lane closure

Works location: A205

Works description: Removal Of Trees From Footpath And Resurfacing Sb Lane. Sb Lane 1&2 Closure. Nb Lane 1 Closure.

Responsibility for works: Transport For London

Current status: Planned work about to start

A4 Great West Road, Brentford

27 June — 08 July

Delays likely Lane closure

Works location: A4

Works description: Footway Renewal Completed 1/2 And 1/2 Minimum 1.2m For Pedestrians. Chapter 8. Lane 1 Closure For Off Peak Night Works.

Responsibility for works: Transport For London

Current status: Planned work about to start

Essex Place Square, Chiswick

27 June — 15 July

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: National Grid Gas Plc

Current status: Advanced planning

Source: www.roadworks.org

July 1, 2016

Bookmark and Share