Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area.
A315 Chiswick High Road |
23 May — 25 May |
Delays likely Traffic control (multi-way signals) |
Works location: A315 |
Works description: Sewer S81 Planned--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
Flanders Road, Chiswick |
17 May — 24 May |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Hounslow London Borough Council |
Current status: Planned work about to start |
A205 Chiswick High Road (North Circular Road), Chiswick |
24 May — 24 May |
Delays likely Lane closure |
Works location: A205 |
Works description: 25/718 Tel0081962 - To Straighten Ovd Sign, 22:00 - 23:59, Northbound C/W Lane 1 And F/W To Chamber (Ped Access Maintained) |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
A315 Chiswick High Road, Chiswick |
24 May — 24 May |
Delays likely Lane closure |
Works location: A315 |
Works description: 25/718 Tel0081962 - To Straighten Ovd Sign, 22:00 - 23:59, Northbound C/W Lane 1 And F/W To Chamber (Ped Access Maintained) |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
Riverview Road, Chiswick |
24 May — 30 May |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Hounslow London Borough Council |
Current status: Planned work about to start |
|
Devonshire Road, Chiswick |
03 May — 10 June |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
Source: www.roadworks.org
May 23, 2016
|