Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area: Some may not cause delays but residents may be interested to know of work going on in advance.
A316 Great Chertsey Road, Chiswick |
28 April — 29 April |
|
|
Delays likely Lane closure |
|
Works location: A316 |
|
|
Works description: Cpp - Cyclic, Maintenance, Annual Works, Collaborative Working. (Lane 2 Of 2 Closed Changing To Lane 1 Of 2 Closed) |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
B490 Acton Lane |
26 April — 29 April |
Delays likely Traffic control (Stop/Go boards) |
Works location: B490 |
Works description: Lay 4x Domestic 32mm Pe Services 4m From Main In Carriageway |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
Essex Place Square, Chiswick |
11 April — 29 April |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
Source: www.roadworks.org
April 28, 2016
|