Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area: Some may not cause delays but residents may be interested to know of work going on in advance.
A315 Chiswick High Road, Chiswick |
04 February — 08 February Traffic control (multi-way signals) |
Delays likely due to Streetworks
Removal And Re-Lining Of Yellow Box Junction at A315 |
Responsibility: Hounslow London Borough Council |
EToN status: Planned work about to start |
|
|
A315 Chiswick High Road, Chiswick |
05 February — 09 February Traffic control (multi-way signals) |
Delays likely due to Streetworks
Removal And Re-Lining Of Yellow Box Junction at A315 |
Responsibility: Hounslow London Borough Council |
EToN status: Planned work about to start |
|
|
Grove Park Terrace, Chiswick |
06 February — 08 February Road closure |
Delays likely due to Streetworks
Track Maintenance Working From 23.30-03:30 Continuous Working at Grove Park Level Crossing |
Responsibility: Network Rail Infrastructure Ltd |
EToN status: Advanced planning |
|
A315 Chiswick High Road, Chiswick |
08 February — 09 February Lane closure |
Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling And Jointing Works In Existing Duct. Required For New Customer Connection at A315 |
Responsibility: BT |
EToN status: Planned work about to start |
|
A402 Goldhawk Road, Hammersmith And Fulham |
08 February — 09 February Lane closure |
Delays likely due to Streetworks
11/010 Tel27014 - To Replace Magnetometer Sd4, 20.00-05.00, Noisy Works To Be Completed By 21:30southbound C/W Lane 2 And F/W To Chamber (Ped Access Maintained) at A402 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
A402 Goldhawk Road, Hammersmith And Fulham |
08 February — 09 February Contra-flow |
Delays likely due to Streetworks
11/010 Tel27014 - To Replace Magnetometer Sd2, 20.00-05.00, Noisy Works To Be Completed By 21:30. N/B C/W Lane 1 Traffic To Use Part Of S/B Lane 2 And F/W To Chamber (Ped Access Maintained) at A402 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
A4 Great West Road, Brentford |
08 February — 09 February Lane closure |
Delays likely due to Streetworks
25/012 Tel0064043 - Access Tfl Traffic Signal, Pole 7 Mast Arm. B Hase Red Aspect Out. 23:00-05:00 (One Night). E/B Lanes 3 And 4 Due To Mast Arm. at A4 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
A406 Gunnersbury Avenue (North Circular Road) |
11 January — 28 March Lane closure |
Delays likely due to Streetworks
Ti Modernisation Scheme/ Pedestrian Crossing Lane 1 Switch To Lane 2 Closure And Back To Back Lane 2'S Around Ped Islands. Works To Finish 16/12/15 And Continue 04/01/16 24/7 Fw 2100 - 0530 Cw at A406 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
A406 Gunnersbury Avenue |
11 January — 28 March Lane closure |
Delays likely due to Streetworks
Ti Modernisation Scheme/ Pedestrian Crossing Lane 1 Switch To Lane 2 Closure And Back To Back Lane 2'S Around Ped Islands. Works To Finish 16/12/15 And Continue 04/01/16 24/7 Fw 2100 - 0530 Cw. No Works To Take Place Night Of 05/02 - 06/02/16. at A406 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
B4491/A4000 Gunnersbury Lane |
11 January — 28 March Lane closure |
Delays likely due to Streetworks
Ti Modernisation Scheme/ Pedestrian Crossing Lane 1 Switch To Lane 2 Closure And Back To Back Lane 2'S Around Ped Islands. Works To Finish 16/12/15 And Continue 04/01/16 2000 - 0500(F/W) 2200 - 0500 (C/W) at B4491/A4000 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
B4491 Popes Lane |
11 January — 28 March Lane closure |
Delays likely due to Streetworks
Ti Modernisation Scheme/ Pedestrian Crossing Lane 1 Switch To Lane 2 Closure And Back To Back Lane 2'S Around Ped Islands. Works To Finish 16/12/15 And Continue 04/01/16 2000 - 0500 (F/W) 2200 - 0500 (C/W) Tman N1501164-001-W001 at B4491 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
Source: www.roadworks.org
February 7, 2016
|