Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area: Some may not cause delays but residents may be interested to know of work going on in advance.
Devonshire Road Facing Twelve Week Closure To Traffic From 25 January
Devonshire Road, Chiswick |
25 January — 18 March Road closure |
Delays likely due to Streetworks
- at - |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
Bollo Lane, Acton |
24 January — 24 January Road closure |
|
|
Delays likely due to Streetworks
Repair Rail Defect, 24/01/2016 At 01.10 Until 24/01/2016 At 07.05 at Bollo Lane Level Crossing( North London Line) |
|
|
Responsibility: Network Rail Infrastructure Ltd |
|
|
EToN status: Advanced planning |
|
|
|
|
|
|
A406 Gunnersbury Avenue (North Circular Road) |
11 January — 28 March Lane closure |
Delays likely due to Streetworks
Ti Modernisation Scheme/ Pedestrian Crossing Lane 1 Switch To Lane 2 Closure And Back To Back Lane 2'S Around Ped Islands. Works To Finish 16/12/15 And Continue 04/01/16 24/7 Fw 2100 - 0530 Cw at A406 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
A406 Gunnersbury Avenue |
11 January — 28 March Lane closure |
Delays likely due to Streetworks
Ti Modernisation Scheme/ Pedestrian Crossing Lane 1 Switch To Lane 2 Closure And Back To Back Lane 2'S Around Ped Islands. Works To Finish 16/12/15 And Continue 04/01/16 24/7 Fw 2100 - 0530 Cw. No Works To Take Place Night Of 05/02 - 06/02/16. at A406 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
B4491/A4000 Gunnersbury Lane |
11 January — 28 March Lane closure |
Delays likely due to Streetworks
Ti Modernisation Scheme/ Pedestrian Crossing Lane 1 Switch To Lane 2 Closure And Back To Back Lane 2'S Around Ped Islands. Works To Finish 16/12/15 And Continue 04/01/16 2000 - 0500(F/W) 2200 - 0500 (C/W) at B4491/A4000 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
B4491 Popes Lane, Ealing |
23 January — 04 May Lane closure |
|
|
Delays likely due to Streetworks
Ti Modernisation Scheme/ Pedestrian Crossing Lane 1 Switch To Lane 2 Closure And Back To Back Lane 2'S Around Ped Islands. Works To Finish 16/12/15 And Continue 04/01/16 0800 - 1600 (F/W) 0930 - 1600 (C/W) at B4491 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Advanced planning |
|
|
|
|
|
Source: www.roadworks.org
January 23, 2016
|