Traffic Delays Likely in Chiswick

Planned roadworks in the W4 area

 
Participate

Traffic and Travel in Chiswick

Sign up for our free weekly newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Chiswick area:

Major Work On Chiswick Bridge

A4/A3005 Great West Road

17 November — 18 November

Delays likely Lane closure

Works location: A4/A3005

Works description: Cpp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Nearside Lane Closures With Offside Lane Running Wb 22:30 To 05:00 Slip No Nw12-0365

Responsibility for works: Transport For London

Current status: Planned work about to start

 

B490 Acton Lane, Chiswick

16 November — 19 November

Delays likely Road closure

Works location: B490

Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start


B490 Acton Lane, Chiswick

16 October — 05 December

Delays likely Traffic control (two-way signals)

Works location: B490

Works description: Traffic Signals Modernisation Site 25/149 Localised Pedestrain Management On Footway. Temporary Traffic Signals - 0800 To 1800 Lane Closures Temporary Traffic Lights 2200 To 0500 Both Directions

Responsibility for works: Transport For London

Current status: Planned work about to start

Great Chertsey Road, Chiswick

17 September — 03 December

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

B4491 Popes Lane, Ealing
24 July - 10 January 2015
Delays likely Lane closure
Location : B4491 Description : To excavate trench lay ducting for future cable lay, jointbays will be required and install ducting for 132KV and will replace the exisiting oil filled cables, jointbays will be app 12 meters by 4 meters wide, the route will be ducted and jointbays dug seperately, works will involve weekend works and nights if requested, mostly lane closure, small pinchpoint poss closure Traffic lights, etc

Gunnersbury Avenue (North Circular Road)

02 June — 30 November 2015

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

 

Source: www.roadworks.org

November 16, 2014

Bookmark and Share