Planned roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area:
Major Work On Chiswick Bridge
B409 Bath Road, Chiswick |
04 November — 06 November |
Delays likely Traffic control (two-way signals) |
Works location: B409 |
Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
B490 Acton Lane, Chiswick |
16 October — 05 December |
Delays likely Traffic control (two-way signals) |
Works location: B490 |
Works description: Traffic Signals Modernisation Site 25/149 Localised Pedestrain Management On Footway. Temporary Traffic Signals - 0800 To 1800 Lane Closures Temporary Traffic Lights 2200 To 0500 Both Directions |
Responsibility for works: Transport For London |
Current status: Planned work about to start
|
|
Great Chertsey Road, Chiswick |
17 September — 03 December |
Delays likely Traffic control (two-way signals) |
Works location: - |
Works description: - |
Responsibility for works: Transport For London |
Current status: Advanced planning
|
|
Great Chertsey Road, Chiswick |
18 September — 05 November |
Delays likely Traffic control (multi-way signals) |
Works location: - |
Works description: - |
Responsibility for works: Transport For London |
Current status: Planned work about to start
|
|
B4491 Popes Lane, Ealing |
24 July - 10 January 2015 |
Delays likely Lane closure |
Location : B4491 Description : To excavate trench lay ducting for future cable lay, jointbays will be required and install ducting for 132KV and will replace the exisiting oil filled cables, jointbays will be app 12 meters by 4 meters wide, the route will be ducted and jointbays dug seperately, works will involve weekend works and nights if requested, mostly lane closure, small pinchpoint poss closure Traffic lights, etc |
|
Great West Road, Brentford |
09 June — 31 October |
Delays likely Lane closure |
Works location: - |
Works description: - |
Responsibility for works: Transport For London |
Current status: Advanced planning
|
Gunnersbury Avenue (North Circular Road) |
02 June — 30 November 2015 |
Delays likely Lane closure |
Works location: - |
Works description: - |
Responsibility for works: Transport For London |
Current status: Advanced planning
|
|
Source: www.roadworks.org
November 3, 2014
|