Traffic Delays Likely in Chiswick

Planned roadworks in the W4 area

 
Participate

Traffic and Travel in Chiswick

Sign up for our free weekly newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Chiswick area:

Hogarth Flyover To Be Closed For Summer

Putney Bridge Closure Date Confirmed

Major Work Begins On Chiswick Bridge

Partial Closures Announced For Hammersmith Flyover

A316 Burlington Lane, Chiswick, London, London Borough Of Hounslow

19 July — 31 August
Delays likely Road closure
Works location: A316
Works description: Full Closure Of Structure For Renewal Of Bridge Deck Eb 0001 On 19.07 To 2359 On 31.08 - Closure In Situ For 24 Hours Between These Dates
Responsibility for works: Transport For London
Current status: Planned work about to start

Roadworks
A406 Gunnersbury Avenue (North Circular Road), London, London Borough Of Hounslow

28 July — 29 July
Delays likely Lane closure
Works location: A406
Works description: Cpp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Nearside Lane Closure With Offside Lane Running - All Vehicle Movements Maintained Wb 2200 To 0500 Slip No Nw12-0332
Responsibility for works: Transport For London
Current status: Advanced planning


________________________________________
A406 Gunnersbury Avenue (North Circular Road), London, London Borough Of Hounslow

29 July — 30 July
Delays likely Lane closure
Works location: A406
Works description: Cpp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Offside Lane Closure With Nearside Lane Running - All Vehicle Movements Maintained Wb 2200 To 0500 Slip No Nw12-0332
Responsibility for works: Transport For London
Current status: Advanced planning


Burlington Lane, Chiswick, London, London Borough Of Hounslow

28 July — 29 July
Delays likely Road closure
Works location: Hogarth Carbridge
Works description: Urgent Structure Inspections Full Closure Eb Night Works
Responsibility for works: Transport For London
Current status: Planned work about to start

________________________________________
M4

28 July — 30 July
Delays likely Some carriageway incursion
Works location: The M4 Westbound Will Be Closed Between Junctions J1 And J3, Due To Roadworks, Between 10 Pm And 5 Am, From 28 July 2014 To 30 July 2014.
Works description: -
Responsibility for works: Highways Agency
Current status: Planned work about to start



B408 Askew Road, London, Hammersmith And Fulham

28 July — 29 July
Delays possible Some carriageway incursion
Works location: B408
Works description: Blocked Tee - Footway
Responsibility for works: Virgin Media
Current status: Planned work about to start

________________________________________
B490/B409 South Parade, Chiswick, Ealing

28 July — 29 July
Delays possible Some carriageway incursion
Works location: B490/B409
Works description: Missing Tee In Footway
Responsibility for works: Virgin Media
Current status: Planned work about to start

 

Great West Road, Brentford

09 June — 31 October

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

Gunnersbury Avenue (North Circular Road)

02 June — 30 November 2015

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

 

Source: www.roadworks.org

July 28, 2014

Bookmark and Share