Traffic Delays Likely in Chiswick

Planned roadworks in the W4 area

 
Participate

Traffic and Travel in Chiswick

Sign up for our free weekly newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Chiswick area:

Major Work Begins On Chiswick Bridge

Hogarth Flyover Works Begin

Partial Closures Announced For Hammersmith Flyover

Bollo Lane, Chiswick, Ealing

02 June — 13 June

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: E S Pipelines Ltd

Current status: Planned work about to start

 

Chiswick Lane, Chiswick

02 June — 11 June

Delays likely Traffic control (multi-way signals)

Works location: Wilton Av To Chiswick Ln, A316/020_2e_01, Ped Crossing At Wilton Avenue W/B, Ped Crossing At Wilton Avenue S/B

Works description: Anti-Skid Works & Resurfacing (Tarmac)

Responsibility for works: Hounslow London Borough Council

Current status: Planned work about to start

Gunnersbury Avenue (North Circular Road)

02 June — 30 November 2015

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

 

Heathfield Terrace, Chiswick

03 June — 12 June

Delays likely Traffic control (multi-way signals)

Works location: Jct Sutton Ln To Chiswick High Rd, A3000/050_3d_01, Approach To A315 Chiswick High Road E/B

Works description: Anti-Skid Works & Resurfacing (Tarmac)

Responsibility for works: Hounslow London Borough Council

Current status: Planned work about to start


Chiswick High Road, Chiswick

06 June — 10 June

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

Burlington Lane, Chiswick

09 June — 10 June

Delays likely Road closure

Works location: Hogarth Carbridge

Works description: Urgent Structure Inspections Full Closure Eb Night Works

Responsibility for works: Transport For London

Current status: Planned work about to start

Capital Interchange Way

09 June — 11 June

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Hounslow London Borough Council

Current status: Planned work about to start

Chiswick High Road, Chiswick

09 June — 19 June

Delays likely Traffic control (multi-way signals)

Works location: Acton Ln To Devonshire Rd A315/050_1a_01, A315/060_1a_01, A315/070_1a_01

Works description: Anti-Skid Works & Resurfacing (Tarmac)

Responsibility for works: Hounslow London Borough Council

Current status: Planned work about to start

Great West Road, Brentford

09 June — 31 October

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

M4

09 June — 13 June

Delays likely

Works location: The M4 Eastbound Will Be Closed Between Junctions J3 And J1, Due To Roadworks, Between 10 Pm And 5 Am, From 9 June 2014 To 13 June 2014.

Works description: -

Responsibility for works: Highways Agency

Current status: Planned work about to start

 

Source: www.roadworks.org

June 8, 2014

Bookmark and Share