Traffic Delays Likely in Chiswick

Planned roadworks in the W4 area

 
Participate

Traffic and Travel in Chiswick

Sign up for our free weekly newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Chiswick area:

Major Work Begins On Chiswick Bridge

Hogarth Flyover Works Begin

Bollo Lane

18 May — 19 May

Delays likely Road closure

Works location: Level Crossing

Works description: Loading And Unloading Rails And Scrap At Crossing Working From 18/5/14 At 01.10 Until 19/1/14 At 01.00

Responsibility for works: Network Rail Infrastructure Ltd

Current status: Advanced planning

 

Burlington Lane, Chiswick

19 May — 20 May

Delays likely Road closure

Works location: Hogarth Carbridge

Works description: Urgent Structure Inspections Full Closure Eb Night Works

Responsibility for works: Transport For London

Current status: Planned work about to start

Turnham Green Terrace, Chiswick

19 May — 22 May

Delays likely Road closure

Works location: Chiswick High Rd To Bedford Park Corner, B491/005_3b_01

Works description: Pfi Carriageway Resurfacing

Responsibility for works: Hounslow London Borough Council

Current status: Planned work about to start


Gunnersbury Avenue (North Circular Road)

12 May — 21 May

Delays likely Contra-flow

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

 

 

Source: www.roadworks.org

May 18, 2014

Bookmark and Share