The following roadworks are likely to cause some delays in the Chiswick area:
Major Work Begins On Chiswick Bridge
Hogarth Flyover Works Begin
Bollo Lane |
18 May — 19 May |
Delays likely Road closure |
Works location: Level Crossing |
Works description: Loading And Unloading Rails And Scrap At Crossing Working From 18/5/14 At 01.10 Until 19/1/14 At 01.00 |
Responsibility for works: Network Rail Infrastructure Ltd |
Current status: Advanced planning |
|
Burlington Lane, Chiswick |
19 May — 20 May |
Delays likely Road closure |
Works location: Hogarth Carbridge |
Works description: Urgent Structure Inspections Full Closure Eb Night Works |
Responsibility for works: Transport For London |
Current status: Planned work about to start
|
|
Turnham Green Terrace, Chiswick |
19 May — 22 May |
Delays likely Road closure |
Works location: Chiswick High Rd To Bedford Park Corner, B491/005_3b_01 |
Works description: Pfi Carriageway Resurfacing |
Responsibility for works: Hounslow London Borough Council |
Current status: Planned work about to start |
|
Gunnersbury Avenue (North Circular Road) |
12 May — 21 May |
Delays likely Contra-flow |
Works location: - |
Works description: - |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|